In recent years, traffic flows have changed significantly as a result of socio-demographic developments and changes in the network structure in northern Thuringia. This led to the necessity of a fundamental revision of the 15-year-old coordination of traffic lights in the course of the B 247. The aim was to reduce the environmental impact by liquidation of traffic. The study was based on a comprehensive empirical assessment of traffic demand in 15 junctions.

In a second step, all traffic light programs were adapted and the existing synchronised traffic Lights, the so called "Green Wave", optimized. The entire traffic flow was tested with the help of a traffic-dependent microscopic traffic flow simulation, on the basis of which the reduction of negative environmental effects could also be demonstrated.

 

 

 



We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.